Home / Machine vision / Loss calculator

Insight · Free tool · 2 minutes

How much does your line lose each year without anyone seeing it?

Product that is discarded or reworked, staff dedicated to manual inspection, stoppages, format changeovers and customer complaints. Fill in what you know about your line, switch on the losses that affect you and see straight away how much money you are losing and how much you could recover.

1 · Your line

These five figures are all you need for the result. The three in green are an example: replace them with your own.

2 · Refine the calculation (optional)

Tick the items you know for your line: each one opens when ticked. These are the big losses that OEE measures in continuous improvement (LEAN and TPM). Unticked items are not included in the calculation.

Include staff who inspect product manually on the line, sorts, relabels, repacks or recovers rejects, and checks pallets before dispatch.

Every time a customer returns or complains about a batch because of an error that left the factory.

When the inspection (manual or a poorly tuned camera) rejects units that were fine. It is good product that is discarded or rechecked.

Time the line is stopped without it being planned: a breakdown, a jam, missing material. It is valued as production that does not get made.

From the last good unit of one product to the first good unit of the next, including adjustments.

Short stops of seconds or a few minutes (a fallen container, a sensor tripping) that are not recorded but add up to a considerable loss every day.

When the line runs slower than it can, for fear of jams, because of equipment limitations, or out of habit.

Product that is not right until the line stabilises: at the start of a shift, after a changeover or after a stop.

When a batch has to be taken off the market because of a label, allergen, date or closure error. The cost is spread over the three years.

Overfilling to avoid being underweight, product that expires in the warehouse or is discarded when cleaning the line.

Weekend shifts or extended shifts to recover production not completed on time.

Ovens, tunnels, compressors and motors that keep consuming while the line waits.

3 · Your own items (optional, up to 5)

If your line has another loss not listed above, add it with its cost per year.

Savings assumptions (you can change them)

These are cautious assumptions, not a promise: every line is different. Automatic inspection does not stop a defect from happening: it always detects it and records the data to find its cause. The other losses fall when they are measured and their causes tackled, which is what continuous improvement does.

Where do false rejects come from and how are they reduced? Read the guide to false rejects in machine vision.

Full report · free

See the full breakdown and get your report

Once you send your details you will see the breakdown, what you could recover and the payback period right here. We also send you the report with your figures, the losses that weigh most on a line like yours and the three measures that pay off most. A TIVOX engineer reviews it before it is sent and, if you wish, we can go through it in a 20-minute call, with no obligation.